Monday, March 15, 2010

The Rack Server I Was Working On...

On Saturday, I completed swapping three 250 gb hard drives, 4 gb of RAM and the fans from the bad machine to the good one and screwed on the rails after I messed up and accidentally put them in the bad case. I then removed 2 of the 250 gb hard drives for use in other places, all I have left to do is install either Debian net install or Ubuntu Lucid Server.


current server being worked on:

500 watt PSU
1x 250gb Western Digital SATA HDD
2x AMD Opteron (not sure of the specs) Processer
8,096 MB of DDR RAM total (4,048MB per CPU)
4 x 30mm? fans

No comments:

Post a Comment